Change search
Refine search result
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • apa.csl
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rows per page
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sort
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
Select
The maximal number of hits you can export is 250. When you want to export more records please use the Create feeds function.
  • 1.
    Christensen, Dan
    Karlstad University, Division for Engineering Sciences, Physics and Mathematics.
    Prefabricerade eller platsbyggda tak: En jämförelse med avseende på ekonomi, arbetsmiljö och kvalité2007Independent thesis Basic level (university diploma), 15 credits / 22,5 HE creditsStudent thesis
    Abstract [en]

    The main purpose with this diploma work is to compare the two production methods, premanufacturing and on-site construction. The goal is to deduce if one of the alternatives is more attractive than the other in view of economy, work environment and quality. To gather information about how the construction works, two various construction sites have been studied. The premanufactured roof was studied in Kristinehamn during the construction of an eventhall and for the on-site construction a sport arena in Årjäng. Information was also gathered through a literature study and by interviewing active persons in the building industry.

    The premanufactured roofs have been used in Norway with great success during a long period of time but are not that common here in Sweden. By increasing the understanding of the advantage and disadvantage of premanufactured building elements, they can be used with greater success. The building industry has under some time been pushed to build cheaper and faster, maybe the premanufactured element is the way to achieve this goal.

    Download full text (pdf)
    FULLTEXT01
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • apa.csl
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf