Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • apa.csl
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Implementering av lean i ett gjuteri med låga volymer och hög variation
Karlstad University, Faculty of Health, Science and Technology (starting 2013).
2014 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

Valmets own foundry in Karlstad has during a long period of time had problems being profitable. The goal today is to turn this around. Today there are three different productionlines; engine blocks, Yankeecylinders and components for the wind turbine industry. This master thesis has focused on examining if value stream mapping is a useful tool to use in a foundry, and therefore outside the typical manufacturing industry. The target has also been to evaluate if there is a possibility to improve the flow in the foundry and also the results.

During the 20 weeks this work has been done at the foundry data has been collected and analyzed. It has been possible to confirm irregularities in the production at several places. Due to limited time the focus of this theses has been at three different areas: The sand core manufacturing, the forming of concrete for Yankee cylinders and also the molds for the castings of engine blocks. Together with the measured times and values a new proposition of the sand core manufacturing has been developed. There has also been a request in examining the possibilities of changing from three shifts to two shifts at the sand core manufacturing. This has been examined and economical calculations has been made. Simulations have been done in a program called Flexsim. The Flexsim model was a simplification of the real situation which therefore affects the reliability of the result. To continue improving the model is something that is recommended for future thesises.

As a complement to the simulations made in Flexim manually simulations was made too, to examine the possibilities of reducing the number of shifts from three to two. The result was clear, it was possible to go down to two shifts. It would though cost approximately 800.000 kr more per year. But with this investment it is possible to produce 5 motor blocks a week steadily for a long time which helps with the payoff of the investment. Every sold motor block results in a profit of approximately 150.000 kr.

It was also found that it is problematic to make use of value stream mapping in a process that is large, contains a large number of sub-steps and also is very irregular. However, the value flow analysis could be used as a complement to the other simulations.

For the production of Yankee cylinders, it was decided that the focus should be on the introduction of a new cement mixer that Valmet bought into. The problem has been how it will be able to reach all three pits, as these are large and extends over a large area. After discussion, it was decided to proceed with a concept that means that the entire cement mixer will be mobile. Valmet themselves then took the decision that the results shall be recorded and then transferred to Valmet since the introduction of the mixer extends too big for this thesis. In summary, it has been noted that there are a lot of things to do. The foundry is in great need of improvements in productivity, standardization, 5S and so on, and there is a huge potential in the future to improve profitability. Even outside the three areas that this thesis has focused on.

Place, publisher, year, edition, pages
2014.
Keywords [sv]
Värdeflödesanalys
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:kau:diva-33260OAI: oai:DiVA.org:kau-33260DiVA, id: diva2:734409
Educational program
Engineering: Mechanical Engineering, spec. in Materials Engineering (300 ECTS credits)
Supervisors
Examiners
Available from: 2014-08-19 Created: 2014-07-17 Last updated: 2014-08-19Bibliographically approved

Open Access in DiVA

Exjobb Patrik Sandberg(4625 kB)477 downloads
File information
File name FULLTEXT01.pdfFile size 4625 kBChecksum SHA-512
f6eb85343f5c5e195176f2771018f0a5002fa6f95cac9fb0be709a9ef460cd719aa020f7be2f719abf19e8f40aaf9be5ea3f740ba7931fd3cfad5f07b4df7afb
Type fulltextMimetype application/pdf
arkivfil(4625 kB)506 downloads
File information
File name FULLTEXT02.pdfFile size 4625 kBChecksum SHA-512
f6eb85343f5c5e195176f2771018f0a5002fa6f95cac9fb0be709a9ef460cd719aa020f7be2f719abf19e8f40aaf9be5ea3f740ba7931fd3cfad5f07b4df7afb
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Sandberg, Patrik
By organisation
Faculty of Health, Science and Technology (starting 2013)
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 983 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 539 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • apa.csl
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf