Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Egenkontrollsystem: Con-Form Töcksfors AB
Karlstad University, Division for Engineering Sciences, Physics and Mathematics.
2006 (Swedish)Independent thesis Basic level (professional degree), 15 points / 22,5 hpStudent thesis
Abstract [sv]

Con-Form Töcksfors AB är ett företag som tillverkar badrumsmoduler, de har ett egenkontrollsystem för att säkra kvaliteten. Det finns dock brister i det, bland annat har moduler som levererats inte alltid innehållit det som kunden har beställt, till exempel har det varit fel handfat eller kakel De har ett egenkontrollsystem men det är bristfälligt och saknar rutin. Till följd av detta har det till exempel blivit problem att bevisa att en skada som upptäckts efter leverans inte har varit orsakad av Con-Form Töcksfors. Syftet med arbetet är att utforma ett egenkontrollsystem åt Con-Form Töcksfors AB som omfattar både projektering och produktion.

Problemställningen för arbetet är: Hur ska det nya egenkontrollsystemet vara utformat för att Con-Form Töcksfors AB ska veta att de levererar varor med rätt kvalitet och hur ska systemet utformas till en rutin som blir en del av det nuvarande arbetet?

För att egenkontrollsystemet ska bli så heltäckande som möjligt, krävs en ingående studie av både projektering och produktion. För att komma fram till ett nytt fungerande egenkontrollsystem har författaren varit ansvarig för projekteringen av badrumsmodulerna på Steinhammerveien i Oslo. En längre studie av fabrikens framställning av badrumsmoduler, med noggranna iakttagelser av tillvägagångssättet, är också gjord.

Det befintliga egenkontrollsystemet omfattar tre olika delar: egenkontroll av ritningshantering i projekteringen, en inplastad planritning och en checklista i produktionen.

I det nya egenkontrollsystemet har det tillkommit tre nya delar: en checklista i projekteringen, planscher och en innehållsförteckning i produktionen. De här delarna kan inte ersätta den gamla egenkontrollen utan blir istället ett komplement. Alla delar i det tidigare systemet kommer därmed att finnas kvar.

Abstract [en]

The company Con-Form Töcksfors AB manufactures bathroom modules. Their existing self control system is lacking and it’s missing in routine. From this follows that it is hard to prove that damages discovered after delivery are not caused by Con-Form Töcksfors AB. The goal of this project is to design a self control system for Con-Form Töcksfors AB encompassing both planning and production.

The working thesis for this paper is as follows: How should a self control system be constructed so that Con-Form Töcksfors AB know they deliver goods of the right quality and how should this new system become routine and a natural part of the work procedure.

To do the self control system as thorough as possible a study of both planning and production is necessary. In order to design a new control system, the author was responsible for the planning of Steinhammerveien, Oslo. A longer on-site study of the manufacturing of bathroom modules, with detailed observations of the procedures, has also been made.

The present system consists of three parts, control of the managing of drawings, plasticized drawings and a checklist in the production stage.

In the new system three parts have been added: a checklist to be used in the planning stage, posters and an index to be used in the production stage.

These new additions cannot replace the old control system but should be seen as a complement. All parts of the old system will there for remain.

Place, publisher, year, edition, pages
2006. , p. 37
Keywords [sv]
Byggteknik
National Category
Building Technologies
Identifiers
URN: urn:nbn:se:kau:diva-385OAI: oai:DiVA.org:kau-385DiVA, id: diva2:6037
Presentation
2006-06-01
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-09-11 Created: 2006-09-11

Open Access in DiVA

fulltext(422 kB)1986 downloads
File information
File name FULLTEXT01.pdfFile size 422 kBChecksum SHA-1
617222e169bb366eaadd9e03d8c5a9b890c345d2e493c7359a90c61a7063a8b5e57519af
Type fulltextMimetype application/pdf

By organisation
Division for Engineering Sciences, Physics and Mathematics
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 1986 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 693 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf