Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Problem och utmaningar i arbetet med APD-planer: En studie med fokus på fel, brister och slöseri i arbetet med och hantering av APD-planer.
Karlstad University.
2019 (Swedish)Independent thesis Basic level (degree of Bachelor), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Problems and challenges to work with construction site plans : A study focusing on errors, shortcomings and waste in the work with and management of construction site plans. (English)
Abstract [sv]

Studien - Vad undersöks?

I examensarbetet undersöks vilka problem det finns i fallföretagets arbete med och hantering av APD-planer under produktionen som leder till fel, brister och slöseri. Vidare undersöks varför dessa problem uppstår. Avslutningsvis redovisar studien de nödvändiga förändringar som måste ske inom fallföretaget för att förbättra verksamhetens nuvarande arbetet med och hantering av APD-planer.  Studien avgränsar sig inom husbyggnadsteknik och behandla endast byggprojekt.

Syfte – Varför?

Syftet med studien är att ge fallföretaget en bättre insyn i vart och i vilken omfattning aktuella problem förekommer samt hur fallföretagets anställda upplever dessa.

 

Metodval – Hur utfördes studien?

Undersökningar i studien utförs med hjälp av frågeformulär, enkäter, intervjuer, litteraturstudier i området samt observationer på arbetsplatser. I arbetet utfördes tre observationer.

Frågeformulär samt enkäten skickades ut inom verksamheten till en utvald grupp (arbetsledare, platschefer, VDC-ingenjör m.fl.). Totalt antal respondenter som deltog i frågeformuläret var nio personer.  Totalt antal deltagande respondenter i enkäten var tretton personer.

I examensarbetet utfördes sammanlagd fem intervjuer, intervjuerna spelades in och tog mellan 20 till 50 minuter.

Utöver det utfördes tre platsbesök vid tre olika stora byggprojekt där arbetet med APD-planen undersöktes. Till varje platsbesök kopplades också en intervju med arbetsledningen på plats, undersökningarna avslutades med en rundgång på respektive byggarbetsplats.

Resultat – Vad kom studien fram till?

De tre största orsakerna som leder till fel, brister och slöseri hos fallföretaget i arbetet med och hantering av APD-planer under produktionen är:

1. Ofullständiga APD-planer

2. Dålig uppdatering av befintliga APD-planer

3. Bristande användningen av APD-planen under produktionen

De tre största anledningarna till att dessa problem uppstår är:

1. Okunskap

2. Tidspress & stress

3. Ostrukturerade arbetsmetoder

För att minimera problemen som uppstår i arbetet med och hanteringen av APD-planer så bör följande förändringar träda i kraft:

  • APD-planens betydelse måste höjas och lyftas inom företaget.
  • Det krävs en bättre förståelse inom området, utbildning samt kurser bör införas. (Det finns ett stort intresse)
  • Den befintliga informationen om APD-planer på företagets intranät måste uppdateras, den är i nuläget för dåligt.
  • Dokumentation och erfarenhetsåterföring samt arbetet med APD-planen under produktionen bör göras obligatoriskt.
  • Fallföretaget borde utföra mer djupgående undersökningar i ämnesområdet för att lyfta fram potentialen med APD-planering.
  • Verksamheten måste lägga mer fokus på grundläggande problem och sluta med att enskilt fokusera på den tekniska utvecklingen i området.
  • Grundinställningen ”det måste gå fort” måste förändras.
Abstract [en]

Thesis – What is being investigated?

The thesis work examines the obstacles that exist in the case company's work with and management of construction site plans during production that lead to errors, shortcomings and waste. Furthermore, why these obstacles arise. In conclusion, the study presents the necessary changes that must take place within the fall company to improve the current work of the operations and management of construction site plans.

The study delimits itself within housing construction technology and only processes house construction projects.

Purpose – Why was the study conducted?

The purpose of this thesis is to give the case company a better insight into the extent to which current problems occur and how the company's employees experience these.

Method selection - How was the study performed?

Studies in the thesis are carried out with the help of questionnaires, interviews, literature studies in the area and observations at workplaces. In the work, three observations are carried out on three different projects of varying size and scope.

Questionnaires were sent out within the business to a selected group (supervisor, site managers, virtual design and construction engineers, etc.). The total number of respondents who participated in the first questionnaire was nine. The total number of respondents in the second questionnaire was 13.

In the thesis work, a total of five interviews were performed, the interviews were recorded and took between 20 and 50 minutes. In addition to this, three site visits were carried out where the work on the construction site plan was examined. An interview with the work management was also connected to each site visit, the examinations were concluded with a roundabout at the respective construction site.

Results - What did the study come up with?

The three biggest causes that lead to errors, deficiencies and waste of the fall company in the work with and management of construction site plans during production are:

1. Incomplete construction site plans

2. Poor update of existing construction site plans

3. Lack of use of the construction site plan during production

The three main reasons why these errors occur are:

1. Lack of knowledge

2. Time pressure & stress

3. Unstructured working methods

 

In order to minimize these problems, the following changes should take effect:

  • The importance of the construction site plans must be raised within the company.
  • A better understanding of the area is required, education and courses should be introduced.
  • The existing information on construction site plans on the company's intranet must be updated, it is currently too bad.
  • Documentation and experience feedback and work with construction site plans during production should be made compulsory.
  • The case company should carry out more in-depth investigations in the subject area to highlight the potential of construction site planning.
  • The development team must focus more on basic problems instead of only focusing on the technical development in the area

The default way of thinking “it must go fast” must change.

Place, publisher, year, edition, pages
2019. , p. 129
Keywords [sv]
APD-plan, placeringsritning, produktionsplanering, LEAN, Slöseri, forskningsmetoder, arbetsplatsdispositionsplan, intervju, byggplanering, byggledning, byggproduktion, logistikplanering, logistik, byggstyrning, fel på arbetsplatsen, arbetsplatsfel, slöseri på arbetsplatsen, effektivisering på arbetsplatsen
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kau:diva-77141OAI: oai:DiVA.org:kau-77141DiVA, id: diva2:1411139
External cooperation
Veidekke Entreprenad AB
Subject / course
Construction Engineering
Educational program
Study Programme in Building and Construction Engineering
Presentation
2019-06-05, Karlstad Universitet, Karlstad, 09:30 (Swedish)
Supervisors
Examiners
Available from: 2020-03-03 Created: 2020-03-03 Last updated: 2020-03-03Bibliographically approved

Open Access in DiVA

fulltext(3217 kB)18 downloads
File information
File name FULLTEXT01.pdfFile size 3217 kBChecksum SHA-512
f62863990541a8653588c396bf922ef1166b5f58391dfe9fe659c1a5a2c78a0e37458ab726bd249d0c395ccc23f2386761eaab2deec06fb41146cd2717566c46
Type fulltextMimetype application/pdf

By organisation
Karlstad University
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 18 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 42 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf