Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Beläggningsanalys för Kvaerner Kamfab AB vid tillverkning av Compact Press
2001 (Swedish)Independent thesis Basic level (professional degree)Student thesis
Abstract [sv]

Kvaerner Kamfab AB, som tillverkar maskiner till cellulosaindustrin, har tillverkat en ny tvättpress , konstruerad av moderbolaget, Kvaerner Pulping AB. På Kvaerner Kamfab AB räknar man med att den nya tvättpressen kommer att dominera tillverkningen i framtiden. För att få en uppfattning om kapacitetsbehovet vid olika leveransförutsättningar vid tillverkning av den nya tvättpressen, med varunamnet COMPACT PRESS, ville man få en beläggningsanalys utförd. Avsikten med detta examensarbete var att ta fram ett verktyg för produktionssimulering vid tillverkning av COMPACT PRESS. Förutsättningarna som gavs, var att analysera kapacitetsbehovet om leveranstiden för en COMPACT PRESS inte skulle överstiga 4 månader. Vi skulle också ge en bild av beläggningen om man vid order på upp till 6 stycken COMPACT PRESS hade 2 respektive 3 veckors utleveranstakt. Verktyget har utarbetats i dataprogrammen Microsoft Project och Excel. Med dess hjälp kan man identifiera flaskhalsar och utifrån denna information fatta beslut om lämpliga åtgärder för att tidsmässigt optimera produktionen. Denna rapport presenterar verktygets olika delar, samt de slutsatser som kan dras vid analys av de olika dokumenten. De slutsatser som vi kom fram till var i korthet: * Man klarar idag tillverkning av en COMPACT PRESS inom 4 månader, men hemtagning av material förlänger leveranstiden med 8-9 veckor. Företaget borde därför diskutera viss lagerhållning. Som beslutsunderlag har vi inkluderat en ”lagerhållningsmatris”, där de tidsmässiga samt ekonomiska konsekvenserna av lagerhållning redovisas. * Generellt gäller att tillverkningskontrollen efter olika bearbetningar av de ingående detaljerna i en COMPACT PRESS tar mycket tid i anspråk. Vid varje tillverkningskontroll måste detaljen flyttas till en särskild station för att utföras av särskild personal. Om operatörerna fick utbildning i att själva göra vissa tillverkningskontroller, skulle tidsbesparing möjliggöras. * Vid utleveranstakt på 2 veckor av 6 maskiner är företagets bäddfräs, påkrympningsstation och vridstation flaskhalsar. Vid 3 veckors utleveranstakt är endast bäddfräsen flaskhals. * Den nuvarande verkstadslayouten är anpassad till Kamfabs nuvarande flexibla produktion. Vid en eventuell tillverkning av endast COMPACT PRESS borde verkstadslayouten omarbetas för att minimera kö- och transporttider, vilka idag uppgår till nästan 50% av den totala ledtiden. I vår slutsats nämner vi även en lämplig fortsättning på användandet av verktyget, samt föreslår utarbetandet av en modell för att öka användbarheten.

Abstract [en]

Kvaerner Kamfab AB, that manufactures machines for the cellulose industry, have produced a new wash press , designed by their parent company, Kvaerner Pulping AB. Kvaerner Kamfab AB think that the new wash press will dominate their future production. To get an idea of the need for capacity under different terms of delivery at production of the new wash press, named COMPACT PRESS, an analysis was needed. The purpose of this thesis was to design a tool for production simulation at manufacture of COMPACT PRESS. The terms that were given, were to analyse the need for capacity if the time of delivery for one COMPACT PRESS should not exceed 4 months. We were also to give an image of the need for capacity in case of an order for 6 pieces of COMPACT PRESS at 2 and 3 weeks’ pace of delivery respectively. The tool has been made by using the computer programs Microsoft Project and Excel. Using this tool, bottlenecks are identifiable and makes it possible to make decisions on suitable actions to optimise the production. This report presents the different parts of the tool, and the conclusions that can be made when analysing the different documents. The conclusions we made were in short: * Today, one COMPACT PRESS can be manufactured within 4 months, but the purchase of material prolongs the time of delivery by 8-9 weeks. It is therefore recommended that the company should discuss storage of certain material. A “stock keeping table2” is included as a help in such discussions, where the consequences regarding time and economy for stock keeping are shown. * The process of inspecting the goods after different treatments during the production of a COMPACT PRESS is very time consuming. At each inspection, the details must be transported to a special work station to be checked by special staff. If the production staff were given education in how to perform some of the inspections themselves, time could be saved. * At a delivery pace of 2 weeks for 6 machines, the bedding mill, the shrink station (an industrial oven) and the turning station of the company will be bottlenecks. At 3 weeks’ delivery pace, only the bedding mill is a bottleneck. * The present workshop layout is fitted to the present flexible production of Kamfab. In case of manufacture of COMPACT PRESS only, the workshop layout should be redesigned to minimize the queuing and transporting hours, which today take up almost 50 % of the total lead time. In the conclusion, a suitable continuance of the usage of the tool is mentioned. We also suggest that a model to increase the usability is made.

Place, publisher, year, edition, pages
2001. , 83 p.
Identifiers
URN: urn:nbn:se:kau:diva-57175Local ID: MSK-7OAI: oai:DiVA.org:kau-57175DiVA: diva2:1121778
Subject / course
Mechanical Engineering, Bachelor of Science
Available from: 2017-07-12 Created: 2017-07-12

Open Access in DiVA

No full text

Search outside of DiVA

GoogleGoogle Scholar

Total: 14 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf