This thesis are executed during the spring of 2017 within the program in Innovation and Design at Karlstad University. The mission is in collaboration with Karlstad municipality and is a further development of the project "Future Flexible Sports Hall", 2015. ? The project consist of developing a floorball rink.
In order to play in floorball, the rink must be built before each training or match. This takes about 10 minutes to achieve. This means that much of the training time will disappear. The aim of the project was to propose a solution that could shorten settling times between different sports. The design process was used to find solutions that are realizable. The project includes a research followed by an ideation, concept selection and concept development. Two concepts were chosen for further development, but only one concept was further developed through sketches. The second concept will be further developed in a later project. The final further developed concept could meet the goal, but not all criteria in the requirement specification.