Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • apa.csl
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Behovet av pedagogisk projektledning i interna förändringsprojekt
Karlstads universitet, Fakulteten för ekonomi, kommunikation och IT, Avdelningen för informatik och projektledning.
Karlstads universitet, Fakulteten för ekonomi, kommunikation och IT, Avdelningen för informatik och projektledning.
2013 (svensk)Independent thesis Advanced level (degree of Master (One Year)), 10 poäng / 15 hpOppgaveAlternativ tittel
The need for pedagogical project management in internal change projects (engelsk)
Abstract [sv]

Studien utgår från att interna förändringsprojekt inte alltid lyckas men de behövs för att anpassa och modernisera organisationen. Det är ett sätt att hantera den snabba förändringstakten i samhället och konkurrensen med andra. Antalet projekt ökar liksom kraven på resultat och på vad projektledaren ska kunna. Ett ökat fokus på människorna och på förändringsmotstånd är framgångsfaktorer i uppgiften att ändra på medarbetarnas beteende. Grunden för att leda projekt, skriver Jansson och Ljung (2009) är att hårda och mjuka perspektiv måste mötas.

Studien handlar om hur projektbeställaren ser på att ge projektledare med pedagogiska kompetenser implementeringsansvar eller projektledaruppdrag i interna förändringsprojekt eftersom det finns behov av lärande vid förändringar.

Teorin är kopplad till vår undersökning om huruvida organisationer kan utnyttja en dold resurs – pedagogiska projektledare – för att skapa bättre interna förändringsprojekt, att utföra de uppgifter som sammantaget kräver pedagogisk kompetens.

Studien har utgått från en kvalitativ metod i form av kvalitativa intervjuer och tolkande analyser för att ge ett tillräckligt djup i svaren. För att avgränsa och samtidigt få ett tillräckligt underlag för analysen valdes sex projektbeställare ur offentlig sektor. Respondenterna hade stor frihet att utforma svaren i de semistrukturerade intervjuerna. Intervjumaterialet analyserades utifrån ett hermeneutiskt forskningssätt där vi jämförde delar av intervjuerna med intervjuerna i sin helhet för att förstå sammanhangen. Vi utgick från frågeområden om interna förändringsprojekt, projektledning och pedagogisk kompetens.

Studien visar att projektbeställarna ser ett tydligt behov av projektledare med pedagogisk kompetens till förändring som kräver ett förändrat beteende och därmed arbete med människor. Fördjupad pedagogisk kompetens, d.v.s. utöver en allmän pedagogisk kunskap, liknar i studiens mening förändringsledning vilket är ett mer vedertaget begrepp.

Det som skiljer i respondenternas svar är hur implementeringen hanteras och vem som ansvarar för den. Det övervägande svaret är att implementeringen ligger utanför projektet och inte hanteras av projektledaren utan av projektmottagaren som vanligtvis är projektbeställaren eller en linjechef i mottagarorganisationen.

Att en pedagogisk kompetens behövs för att genomföra en lyckad implementering har uttryckts av respondenterna och studien föreslår att implementeringen värdesätts som ett eget projekt lett av en projektledare med pedagogiska kompetenser alternativt att implementeringen ingår som en av faserna i projektet när projektledaren har kunskaper om projektets innehåll och har den pedagogiska kompetensen att implementera det.

Abstract [en]

This study understands that internal change projects do not always succeed but they are needed to adapt and modernize the organization. They are a way to handle the fast pace of change in society and compete with others. The number of projects is increasing as well as requirements for results and project managers´ skills. An increased focus regarding to human and resistance change are key success factors in the task of changing employees' behaviour. Fundamentally for managing projects, according to Jansson and Ljung (2009) is that hard and soft perspectives must be used together.

The study is about how project procurers look at providing pedagogical project managers an implementation responsibility or project management assignments in internal change projects, as there is need for learning to change.

The theory is linked to our inquiry about whether organizations can exploit a hidden resource – the pedagogical project manager - to create better internal change projects, replace both project manager and change leader and perform the tasks requiring pedagogical skills.

The study is based on a qualitative approach in the form of qualitative interviews and interpretive analyses to provide sufficient depth in the answers. To delineate and gain a sufficient basis for the analysis, six project procurers were selected from the public sector. The respondents were free to design the answers in the semi-structured interviews. The interview data were analysed on the basis of hermeneutic research in which we compared parts of the interviews to their entirety in order to understand the context, arising out of question areas of internal change projects, project management and pedagogical skills.

The study indicates that projects procurers see a clear need of project managers with pedagogical skills to changes that require a change in behaviour and thus a human perspective. In the study, enhanced pedagogical skills are similar to change management, which is a more established concept.

The differences in the respondents' answers are how the implementation is handled and who is responsible. The overwhelming answer is that the implementation is located outside the project and is not handled by the project manager but by the project beneficiary who is usually the project procurer or a line manager in the recipient organization.

The respondents expressed, that pedagogical skills are necessary to achieve a successful implementation. The study suggests that implementation is valued as a separate project, led by a project manager with pedagogical competencies or that implementation is included as one of the phases in the project, when the project manager has knowledge of the content and has the pedagogical skills to implement it.

sted, utgiver, år, opplag, sider
2013. , s. 120
Emneord [en]
internal change project, project management, project manager, pedagogical project managers, pedagogical skills, change management, change manager, project procurer, project beneficiary
Emneord [sv]
interna förändringsprojekt, projektledning, projektledare, pedagogiska projektledare, pedagogiska kompetenser, pedagoger, förändringsledning, förändringsledare, projektbeställare, projektmottagare
HSV kategori
Identifikatorer
URN: urn:nbn:se:kau:diva-32124Lokal ID: 129OAI: oai:DiVA.org:kau-32124DiVA, id: diva2:718673
Fag / kurs
Project Leadership
Utdanningsprogram
Master's Degree Programme (one year) in Project Management, 60 hp
Veileder
Examiner
Tilgjengelig fra: 2014-06-13 Laget: 2014-05-21 Sist oppdatert: 2014-06-13bibliografisk kontrollert

Open Access i DiVA

Behovet av pedagogisk projektledning i interna förändringsprojekt(1576 kB)631 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1576 kBChecksum SHA-512
046d76125a5fe283bac053b371eaff8306a3888e55696a31ef7fa4f398cb0efecd5fdc037081d1cee3fac999b62d538f4fb47c664962c82112e1d7d3e3a8d87d
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 633 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 720 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • apa.csl
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf